Second Uganda Ferry in the Box

The second 65′ ferry bound for Lake Victoria is put into the container near Seattle. The hulls must be cut in half to fit into containers. I mistakenly thought that they had elected to bolt the facing bulkheads together instead of keeping the joins

in-plane of the hull as I advised. The bulkheads are only for alignment. Very pleased to hear that.

2 thoughts on “Second Uganda Ferry in the Box”

  1. unless you’ve heard otherwise, they’ll do those in-plane hull joints after reassembly in UG. frame bolts are purely for alignment.

Leave a Reply

Your email address will not be published. Required fields are marked *